top of page
Image by Gene Gallin

Demolition in Farnham

Untitled - 25 August 2026 at 14.08.25 (6).png

Soft strip, structural demolition, asbestos surveys arranged, site clearance and concrete crushing for homes and sites across Farnham and the villages nearby. Fully insured, free written quote.

Image by Milivoj Kuhar

Consents first

  • Farnham's centre holds several hundred listed buildings, and demolishing part of one without listed building consent is a criminal offence, so the address is checked.

  • Asbestos is presumed in anything pre-2000 until a survey rules it out, and on a home that survey falls to us.

  • We lodge the Section 80 notice with the council six weeks before starting, then wait the period out.

  • Party wall notices to neighbours, a photographic schedule of condition, and utilities capped and certified.

Image by Vincenzo Cassano

Coming down

  • Recycling starts with the strip out: fittings, timber, metal and glass come out before anything structural moves.

  • Demolition follows a worked-out sequence with propping to the design, rather than simply pushing it over.

  • Anything a machine cannot safely reach is taken down by hand instead.

  • Dust is damped down and the street swept, which is what the neighbours judge you on.

Image by Haberdoedas II

Muckaway and fill

  • If there is space on site, brick and concrete get crushed and reused as fill rather than leaving on lorries and coming back.

  • All other waste is segregated and removed on licensed carriers, with the transfer notes retained for you.

  • Asbestos removal is licensed-contractor work only, and clearance certificates arrive before we go on.

  • The plot is handed back level and safe, hoarded or fenced as agreed, ready to be built on.

Demolition specialists in Farnham

Frequently asked questions

Construction Site Scene

GET YOUR FREE QUOTE NOW

  • Send your postcode, what you would like doing, and a few photographs of the space as it is now.

​

  • We look at what is there before we price anything. The survey and the notice come before any machine.

​

  • You get the quote in writing, itemised line by line, so you can see what each part of the work costs.

​

  • Happy with it? We agree dates in writing before anyone turns up, and you are fully insured throughout.

bottom of page